Металлоконструкции гидроклассификатора (диаметр 6000 мм, высота 22 000 мм) для Николаевского глиноземного завода - 120 тн.  /Украина, г. Николаев/.

Steel structures of the hydraulic classifier (diameter 6000 mm, hight 22,000 mm) for Nikolaev Aluminous Plant (Nikolaev, Ukraine) – 120 tons.

1
 
Image Detail
2
 
Image Detail
3
 
Image Detail
 
Display Num 
 
 
Select site language
2000-2012 results

Rolled Tanks – 87,000 tons
Layer Installed Tanks – 82,000 tons
Steel Structures – 77,700 tons

News

29.08.2013
As of today 1,200 tons of steel structures for the construction of new safe confinement of the Chernobyl nuclear power plant have been shipped. All terms on the contract are met, no reclamations.

19.08.2013
The modernization of the gas-plasma facility, released in 2011, has been carried out for the purpose of expansion of production capacity.

22.04.2013
Shipment of tanks to Kazakhstan has been completed. The contract has been executed on time and without reclamations from the customer.