Image Gallery

Изготовление и поставка резервуаров объемом 3 000 м3 в количестве 6 шт., 1 000 м3 в количестве 6 шт. общим весом 650 тн. (диаметр max = 18 980 мм, высота max = 11 920 мм) для Azizi Hotak Group /Афганистан/

Production and delivery of tanks with capacity of 3,000 m3 in amount of 6 pieces; 1,000 m3 in amount of 6 pieces with total weight of 650 tons (diameter max – 18,980 mm, height – 11,920 mm) for Azizi Hotak Group (Afghanistan).

10
 
Image Detail
11
 
Image Detail
12
 
Image Detail
13
 
Image Detail
 
Display Num 
 
 
Select site language
Rates of exchange
Rates of exchange 13.07.2015
10 російських рублів 3.87 0.03
100 ЄВРО 2451.36 36.26
100 доларів США 2191.65 6.83
News

29.08.2013
As of today 1,200 tons of steel structures for the construction of new safe confinement of the Chernobyl nuclear power plant have been shipped. All terms on the contract are met, no reclamations.

19.08.2013
The modernization of the gas-plasma facility, released in 2011, has been carried out for the purpose of expansion of production capacity.

22.04.2013
Shipment of tanks to Kazakhstan has been completed. The contract has been executed on time and without reclamations from the customer.

All news

2000-2012 results

Rolled Tanks – 87,000 tons
Layer Installed Tanks – 82,000 tons
Steel Structures – 77,700 tons

Site Session Statistics
Content View Hits : 109882
Our Products

Azizi Hotak Group Fuel Terminal, Afghanistan 6 tanks... Read more...
Enakiyevo Metallurgical Works (EMZ),... Read more...
Singapore, South Port Project, OdessaVertical steel... Read more...
Top